Centrum czystych technologii węglowych

GIG, ICHPW

Strona główna » Gallery » Experimental Mine Barbara - Hall D
  • CCTW
    • The structure of the Laboratory Centre in Katowice (GIG)
      • Department of Energy Saving and Air Protection
      • Department for Solid Fuels Quality Assessment
      • Department of Environmental Monitoring
      • Department of Post-Industrial Sites and Waste Management
      • Department of Geology and Geophysics
      • Contacts CCTW Katowice
    • The structure of CCTW Mikołów
      • Laboratory of Experimental Installations
      • Underground Testing Range
    • The key test stands in Technological Unit in Zabrze (IChPW)
  • R&D Projects and Initiatives
    • AWAIR
    • MOLOC
    • TOPS - Technology options for Coupled Underground Coal Gasification and CO2 Capture and Storage
    • HUGE2 - Hydrogen Oriented Underground Coal Gasification for Europe - Environmental and Safety Aspects
    • Developing the Research Potential of Staff for Clean Coal Technologies
    • HUGE - Hydrogen Oriented Underground Coal Gasification for Europe
    • The methodology for allocation of environmental burdens in the life cycle assessment (LCA)
    • HTRPL - Development of High Temperature Reactors for industrial applications
    • TAB - Take A Breath
    • COAL2GAS - Increasing the Efficiency of Coal Through Underground Coal Gasification in European Lignite Mines
  • Gallery
    • CCTW Laboratory Building in Katowice
    • Experimental Mine Barbara - Hall D
    • Experimental Mine Barbara - Underground Testing Range
    • Institute for Chemical Processing of Coal (ChPW) Zabrze - The Technological Unit

This part of the gallery comprises pictures from the construction site of Technological Unit located in Experimental Mine Barbara in Mikołów, Hall D.

  • Experimental Mine Barbara - Hall D
    Experimental Mine Barbara - Hall D
  • Hall D - Technological part
    Hall D - Technological part
  • Hall D - Technological part
    Hall D - Technological part
  • Hall D - Technological part
    Hall D - Technological part
  • Reactor - Simulation of UCG process
    Reactor - Simulation of UCG process
  • Reactor - Simulation of UCG process
    Reactor - Simulation of UCG process
  • Reactor - Simulation of UCG process under pressure
    Reactor - Simulation of UCG process under pressure
  • Reactor - Simulation of UCG process under pressure
    Reactor - Simulation of UCG process under pressure
  • Hall D - Technological part
    Hall D - Technological part
  • Installation for gas separation - PSA
    Installation for gas separation - PSA
  • Home page
  • Contact
  • Site Map
plPolski
Home page | Legal note All rights resered © 2010-2013